Barra do Furado, Brazil

A concept design commissioned by Quissama and Campos Counties for a sand bypassing system at the Barra do Furado Entrance in Brazil. The system is being designed and constructed at present.

The system will comprise a 360m long jetty supporting 9 jet pumps, a high pressure pumping station, low pressure pumping station and a submarine pipeline under the entrance discharging onto the beach on the updrift side.

 