£ Malcperl Engineering
Gold Coast Seaway (Nerang River Entrance) Sand Bypassing System

The concept design and construction supervision of the sand bypassing system consisting of a 490 metre long jetty across the beach into the ocean containing 10 jet pumps, a high pressure pump station, low pressure pump station and a submarine pipeline under the Gold Coast Seaway discharging into the northern beach.

 

Malcperl Engineering

A: 109 Elanora Way, Karalee QLD 4306, Australia

P: PO Box 2221, North Ipswich, QLD 4305, Australia

T: +61 (07) 3294 7596

M: +61 (0416) 044 866